High Zone Recycled Water Reservoirs
Project Description:
The proposed construction of two High Zone Recycled Water Reservoirs will provide 2.5 million gallons of recycled water storage that will serve the Vellano golf course, adjacent neighborhoods and future projects within the H1 and H2 zones.
Location:
One reservoir is located north of Vellano Club Drive between Celano Court and Colinas Pointe. The other reservoir is located north of Venezia Terrace and south of Tall Oak Road.
Status: Construction activities kicked-off on May 17, 2010. The project is expected to conclude mid-April 2011.
Current Construction Activities:
Grading operations are wrapping up at the R41 and R-42 reservoir sites and as
a result additional dirt hauling on Valley Springs Road is required. The dirt haul will begin on Wednesday, July 7 and conclude on Friday, July 9.
Project Contact:
Steve Nix, (909) 364-2766 and Yvette Martinez, (909) 364-2783